menu

Getting GSHP Energy Systems right first time – every time


Chris Davidson

BY: Chris Davidson / 28th Nov

I’m regularly asked to look at problematic energy systems. When they involve GSHP, where do I look to find the smoking gun? The ground loop? No. The heat pumps? No. The pumps then? No. The building? Closer. In fact (almost every time) the secret is a poorly designed control & monitoring package. Start with the building; draw on real world installed experience and get the controls strategy right first time – every time. Full article here. http://goo.gl/Z1Hbu2


Chris Davidson

Hire this consultant


Related Posts